Energy diagnosis in Algar Telecom data centers

Energy diagnosis in Algar Telecom data centers Energy diagnosis in Algar Telecom data centers

2024

Challenge

Participation in the Preliminary Design to Executive Design phases. Alignment of results with Architecture and other disciplines to ensure the inclusion of efficiency measures in projects.

Mitsidi Performance

Integrated project for a large public hospital aiming at optimizing energy efficiency and reducing operating costs.

Results

  • Reduction of the installed Air Conditioning load by 24%;

  • Evaluation of solar water heating and electricity generation systems.

  • Guaranteed thermal comfort with natural ventilation in an area of 4,000 m²;